Hi,
We have about 10 workflows, and we now want to add a Check condition above the existing steps in the workflow. I can change the Insert option to "Before Step", which adds the Check Condition above the current step, but it doesn't add the next step into the Check condition, it just leaves it outside of the check condition.
Is there a way to add the existing steps inside the Check Condition?
I want to add a new Check Condition at the top, so the workflow will only run if the condition is met: