Skip to main content
Community site session details

Community site session details

Session Id :
Finance | Project Operations, Human Resources, ...
Answered

BM Assembly Posting Journal Standard Report

(0) ShareShare
ReportReport
Posted on by 125

Hello folks!  Need some help with adding the expiry date to the standard template above.  I have grabbed it from the Assembly Serial Lot table and put it in the body with the Serial/Lot Number & Qty.

The expiration date still will not show up on the report.  Any suggestions would be greatly appreciated.

Sorry the image isn't better.

Expiration.JPG

  • MelissaK6201 Profile Picture
    125 on at
    RE: BM Assembly Posting Journal Standard Report

    Andrea,

    Please disregard my earlier response.  It turns out the permissions of the modified report was not set to  be used in our system.  That was changed the expiry date is showing as intended.

    Thanks so much for your detailed response, it was very helpful!

  • MelissaK6201 Profile Picture
    125 on at
    RE: BM Assembly Posting Journal Standard Report

    Andrea,

    Please disregard my earlier response.  It turns out the permissions of the modified report was not set to  be used in our system.  That was changed the expiry date is showing as intended.

    Thanks so much for your detailed response, it was very helpful!

  • MelissaK6201 Profile Picture
    125 on at
    RE: BM Assembly Posting Journal Standard Report

    Andrea,

    Please disregard my earlier response.  It turns out the permissions of the modified report was not set to  be used in our system.  That was changed the expiry date is showing as intended.

    Thanks so much for your detailed response, it was very helpful!

  • MelissaK6201 Profile Picture
    125 on at
    RE: BM Assembly Posting Journal Standard Report

    Thank you so much for the response and the details.  Unfortunately, we are using the standard report and not a word template.  With that said any advice on the formatting of the field brought over that I may be missing or need to fix?

    pastedimage1622553482618v1.png

  • Verified answer
    Andrea Melroe Profile Picture
    3,437 on at
    RE: BM Assembly Posting Journal Standard Report

    Hi Melissa,

    This is Andrea, and I’ll assist with your question today.

    I added the expiration date to the BM Assembly Posting Journal from the Assembly Serial Lot table just like you did, and the expiration date does show for me on this report:

    pastedimage1622127333986v1.png

    All in all, it’ looks like you’re on the right track!

    I’d suggest you double check to ensure you’ve got a lot numbered item on the report that has been assigned an expiration date (check the IV00300 table to verify what the expiration date is), and that you’ve granted access to the modified report to the user id you’re logged in as when you print it. You can double check this by doing the following:

    1. Click on Microsoft Dynamics GP >> Tools >> Setup >> System >> User Security.
    2. Choose the User ID you are logged in as, and the company you’re logged into.
    3. Click on the ‘Alternate/Modified Forms and Reports ID’ link at the bottom of the window.
    4. In the Alternate/Modified Forms and Reports ID window:
      • Product = Microsoft Dynamics GP
      • Series = Inventory
      • Type = Reports
    5. Expand the Inventory folder
    6. Expand the BM Assembly Posting Journal
    7. Make sure you’ve got the modified version of this report selected and save your changes.

    Hope this helps!

    Andrea Melroe | Microsoft Support

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

News and Announcements

Now Available: 2025 Release Wave 2

Quick Links

Ramesh Kumar – Community Spotlight

We are honored to recognize Ramesh Kumar as our July 2025 Community…

Congratulations to the June Top 10 Community Leaders!

These are the community rock stars!

Announcing the Engage with the Community forum!

This forum is your space to connect, share, and grow!

Leaderboard > Finance | Project Operations, Human Resources, AX, GP, SL

#1
Abhilash Warrier Profile Picture

Abhilash Warrier 565

#2
Martin Dráb Profile Picture

Martin Dráb 536 Most Valuable Professional

#3
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 402 Super User 2025 Season 1

Product updates

Dynamics 365 release plans