I have a question about BOM:

D0001 - BOM0001(A0001 + B0001)

D0001 is a combination of A0001 and B0001

A0001-bom0002 (ES001 + RS0002)

B0001-bom0003 (LS001 + GS0002)

But A0001 and B0001 are produced by ES,RS,LS and GS materials

When I create a sales order about D0001 and send it to production, how can I simultaneously create the production orders of A0001 and B0001

According to my concept

When I want to produce D0001, I will present three production orders (D0001, A0001, B0001).

*This post is locked for comments

I have the same question (0)
  • Mark Boy2 Profile Picture
    506 on at
    RE: About Production Control(BOM)

    Dear All,

    Could someone give me a hand?

  • Verified answer
    Richard Wehmeyer Profile Picture
    1,004 on at
    RE: About Production Control(BOM)

    Set the line type of A1 and B1 to "Pegged supply"  This will cause hard pegged production orders to be dropped for those items.

    The sub-production will appear after D1 is estimated.

    7_2D00_19_2D00_2019-3_2D00_35_2D00_16-PM.png

  • Richard Wehmeyer Profile Picture
    1,004 on at
    RE: About Production Control(BOM)

    ETA:

    This is native to AX.  If this is only supposed to happen for some scenarios then the line type can also be changed on the production BOM

  • Suggested answer
    guk1964 Profile Picture
    10,888 on at
    RE: About Production Control(BOM)

    Do you need  3 separate production orders? If so and you always make to order, and  lot to lot rather than to inventory ( which may be for multiple requirements for the sub assembly) then the pegged supply is a good option.

    If you want to put sub assembles to stock and then reissue then you can create flat BOM with everything in one BOM and If need be then use phantom lines for the sub assemblies so as to see the structure, and to separately cost the sub assemblies.

  • Mark Boy2 Profile Picture
    506 on at
    RE: About Production Control(BOM)

    Hi, Richard

    Thx you slove my problem ~  

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Abhilash Warrier – Community Spotlight

We are honored to recognize Abhilash Warrier as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
Martin Tocauer Profile Picture

Martin Tocauer 4

#2
Community Member Profile Picture

Community Member 2

#2
Nayyar Siddiqi Profile Picture

Nayyar Siddiqi 2

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans