I have a question about BOM:
D0001 - BOM0001(A0001 + B0001)
D0001 is a combination of A0001 and B0001
A0001-bom0002 (ES001 + RS0002)
B0001-bom0003 (LS001 + GS0002)
But A0001 and B0001 are produced by ES,RS,LS and GS materials
When I create a sales order about D0001 and send it to production, how can I simultaneously create the production orders of A0001 and B0001
According to my concept
When I want to produce D0001, I will present three production orders (D0001, A0001, B0001).
*This post is locked for comments
I have the same question (0)