We're employing outbound sorting assignments for pallet building, utilizing three sorting positions: P1, P2, and P3. After assigning a position, we assign a final pallet/tub number.
- My question is, Why cant we use the existing LP?
- Additionally, is it possible to introduce a number sequence that automatically populates when we assign the sorting position, rather than manually entering it?