Hi All,
In our setup, we have bom line items that we do not track consumption on in ax. For example, say you needed to use some lock-tight on a part. We want to know we need it to make this part, but we aren't going to consume .0004 ounces or whatever on a bom line.
Creating a new production order manually will bring these 0 qty lines into the ProdBOM.
However, we use master planning and usually firm a planned production order. But when I go in and make a new planned production order for an item with a bom line that has 0 qty, that bom line isn't pulled into that planned order's (ReqPO's) Derived Requirements (ReqTrans) records.
I've tried tracing the code, and I can see the system finds that records and inserts it into a record set for insertion... but the end-result is that any 0 qty lines are missing, and therefore after firming are also missing from the ProdBOM.
Is this a bug? A setup issue? Configuration issue? Any help would be appreciated: I'm stuck.