Does anyone know how to have Master Planning (both deprecated & Planning Optimization) exclude Sales Quotations under these either of these circumstances:
Sales quotation expiration date is < current system date of MRP
If no then sales quotations are not included at all
Parameter Probability % = 90
Help test within D365
if you selected the Include sales quotations option, you can select a probability percentage. The master scheduling calculation includes all project or sales order of the Quotation type that have the same probability percentage or higher.
Therefore we expect Sales Quotations that only meet these conditions are included in Master Planning