If an indirect cost is related to route consumption - and as the route is using ressources possibly associated to specific departments Is there then a way to post the indirect cost specific to those departments?
How to set parameters so that dimensions are not from costing sheet indirect line or from employee, but from actual route posting (where dimensions are baesd on job).
Thanks
*This post is locked for comments
I have the same question (0)