Hi community
We have one instance DAX-2012 R2, one EP with two sites deployed (let's call them first and second), everything works fine.
The new requirements are
1) some change only for the second site:
- color of some particular design elements
- logo images
2) the first site should retain the original design. So, finally both the two sites should get different designs.
At the moment both the sites have the same design (colors, fonts etc.) and logos, since there is only one portal deployed.
Question
Would be
- deploying of a new (second portal) connected to the same AOS
- introducing a new site connected with the second portal
the only appropriate solution here or there are some other approaches possible?
Regards
Pavel

Report
All responses (
Answers (