Production Yield and Planning for Chip Bonds

(0) ShareShare
ReportReport
Posted on by 5

Hello,

we are a Chip producing Company and produce Computer Chips with different Lot Sizes. We have a really strong based industrial Focus and want to produce 10K Chips in Month.

We have a certain Problem which we can’t solve at the moment. My suggestions were not enough to fullify our process.

Situation:

We have 1 Transceiver (TRX) as an assembled main product. We create a MRP (material and resource planning) for 500 PCS.

Our Routing defines that we have 10 % scrap and we can have a LOT Size of 50 or 100 Based on which machine it will be assigned. Below this first assembly there is a 1st Sub Assembly with the component “Chips” (like in a BOM). For this we must create LOTS with the size of 50. For the Next Sub Assembly we need a LotSize of 200 for a further SUB Components “Engine”. In the assembly of the “Engine” there are the components “EPIC” with lotsize 746 and “LMP” with lotsize “400”.

We must produce the whole lot size even if we do not need so much. Overproduction of a component is placed in stock. But the Qty of required components for the next production step must be completely available, scrap excludet.

In a BOM:

Component

Lot Size

Scrap (in 1 lot)

output

1 TRX

 

 

 

    2 Chips

50

10% (5pce)

45

       3 Engine

200

5% (10pce)

190

           4 LMP

746

10% (75pce)

671

           4 EPIC

400

10% (40pce)

360

 

For first Production Line "TRX" planning output is 45pcs. We put 50pcs in the Machine and get out 45 (10% Scrap). So Material Consumption will be 50 and output Qty of the Production Order should be 45.

Now we want that the System provides us production order suggestions (MRP) for 500pce TRX with a lot size in prod order of 50pce Chips and Outputs of 45pce TRX.

45 * 12 productions = consumption 600 Chips; output 540pce TRX; 40pce in stock; 60pce scrap

This is the basic of the calculation for the whole BOM. After this all lower levels of the production have to be calculated in the same way. So, 600 Engines are needed to produce 500 Chips:

190 * 4 productions = consumption 800 engines; output 760 Chips; 160 in stock; 40 scrap

I think the principle is clear…

 

Actual I created Planning Parameters for all Items. All items get “Reordering Policy” "LOT for LOT". "Fixed reorder Qty" could work too. For Chips we have a Lot Size of 50, a Minimum Order Qty from 45 and Maximum 45. This make for all virtual LOTS incl. Yield. Engine get 190 (LOT 200, 5% scrap), LMP 380 (LOT 400, Scrap 5%) etc.

With this trick we say the system, you can Produce only in this SIZE. The Setting works for the production BUT that is not Enough for my Colleagues. Because it maybe could DENIED us later Options for Replenishment. Another problem is that Minimum and Maximum Order Qty can be flexible because the yield is increased if production output Qty were better as expected. So, the item parameters would have to be adjusted.

 

We have some Questions:

1. Are we able to create LOTs for Machines, what can the machine carry incl. Yield, that impacts the material Planning?

2. Can we config the system in this way, that the OUTPUT from "Sub A" is the Input for "SUB B"

e.g. Output of “engine” production -500 chips- is the input in the next production order

 

3. Is there any other way without REPLENISHMENT Parameters for Items/Variant/Locations to define a FIXED LOT Size which have an impact on the quantity while planning production orders?

Why this? One item can be produced on different machines with different lot sizes. So, we must be flexible with the lot size.

And we don´t want to minimize our future functions for reordering these components. Different Locations make no sense, variant will be used in another way! Increasing the YIELD (SCRAP) can´t be an option on item or Variant.

 

At the moment my solution looks like the following. But I need a feedback if this could work:

1. TRX get “LOT for Lot” without any Order Modifier

2. TRX Prod get 500 pcs from MRP Order. Than we must implement a logic, which get the LOT Size from Routing (50) calculate Yield = 45 and SPLIT the Prod Line for 500pce in 45 * 12 prod order Lines

3. Engine production in the same Way, System create an order based on Consumption 50 * 12 = 600 GOODS, we assign the lot 200 and get 4 * 190 = 760 GOODS Finished, rest go to Stock

4. ALL Processes must reserve the QTY from the “upper” production level to the “lower” prod level (Should be for Time calculation I think)

5. Reschedule from the lowest production level up to the first.

Could this work? Is it possible in standard or did we need any adjustments?

I have the same question (0)

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

November Spotlight Star - Khushbu Rajvi

Congratulations to a top community star!

Forum Structure Changes Coming on 11/8!

In our never-ending quest to help the Dynamics 365 Community members get answers faster …

Dynamics 365 Community Platform update – Oct 28

Welcome to the next edition of the Community Platform Update. This is a status …

Leaderboard > Business Central

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans