I am converting from HZN manufacturing to GP 10 manufacturing. I am also using actual costing method. I have entered a MO and one of my components has not been fully issued. When I receive the MO I am not flagged to post a pending pick and when I close the MO I do not receive the message that I have a pending pick. Have I missed a setup somewhere? I would think that I would receive a warning that I have not issued all material to WIP
Thanks to all
*This post is locked for comments