I NEED TO ENTER A INVOICE IN 12/16/2015 BUT THE MODULE IN PROJECT CONTROLLER IS CLOSED ALREADY AND IN 13-2015. HOW CAN I CHANGE THE POSTING DATE TO 12-2015 .. IT WILL NOT LET ME POST
*This post is locked for comments
I NEED TO ENTER A INVOICE IN 12/16/2015 BUT THE MODULE IN PROJECT CONTROLLER IS CLOSED ALREADY AND IN 13-2015. HOW CAN I CHANGE THE POSTING DATE TO 12-2015 .. IT WILL NOT LET ME POST
*This post is locked for comments
You should be able to go into Project Controller Setup, change the period back to 12-2015, then save. Process your invoice for period 12-2015.
Once completed, repeat the Project Controller Close Period process.
André Arnaud de Cal...
292,865
Super User 2025 Season 1
Martin Dráb
231,723
Most Valuable Professional
nmaenpaa
101,156
Moderator