Hi all,
Currently trying to process a production order operation by operation (Start Operation 10 to 10, then once finished start operation 20 to 30 for example)..
I was hoping that as I went through the production order the pick list would also be sequentially released, e.g. Starting operation 10 to bring about a pick list for BOM components tied to operation 10 first, then upon starting operation 20, tied BOM components generated in a new pick list journal.. and so forth.
However I only seem to be able to get the pick list to work like this for the first operation and no pick list generated when I start later operations.
I've tied the BOM components to the route and i've got all raw materials flushing principles set to start on the BOM, is there something i'm missing during the process?
Thanks
*This post is locked for comments
I have the same question (0)