Hi All,

Need your suggestion on the below issue :

We are in process to change BOM costing and will In-Active Route but add one line in BOM/formula as follows (done in test) and needs your urgent assistance to fix following 2 points possible today.

1 - Existing system where route is attached system calculates route separately but with new LBC (cost categories) BOM considering LBC Qty as BOM quantity and calculating accordingly (which is wrong and LBC Qty should not be consider as BOM qty).

So IF item ID is LC* and Item Group = "LC-PD-EP" Or "LC-PD-LQ" Or "LC-PD-PW" in BOM/Formula line then Line QTY should not be consider as BOM quantity for any calculations when doing Cost roll up (Price --> Calculations).

Awating your responses !

Regards,

Ganesh Prasad S

*This post is locked for comments

I have the same question (0)
  • Suggested answer
    Weaveriski Profile Picture
    23,616 Moderator on at
    RE: BOM/Formula calculations

    In the routing group used on the lines for those cost categories de-select the estimation flags you do not want. Although if you have costs against them and consume them the cost will still be consumed, so have zero cost categories might be an approach you consider.  

  • Fredrik Sætre Profile Picture
    12,644 on at
    RE: BOM/Formula calculations

    Does your route carry any costs? Does this only cover machine/tool costs?

    You should include labor cost to your route as well and not add them as items.

    Do you have 1:1 labor cost pr. item or do you only have a start up costs resulting in a higher volume to be more cost efficient?

  • Suggested answer
    Bashir Ahmad Profile Picture
    5,248 on at
    RE: BOM/Formula calculations

    Try it:

    community.dynamics.com/.../microsoft-dynamics-ax-2012-create-bill-of-material-bom

  • Community Member Profile Picture
    on at
    RE: BOM/Formula calculations

    Yes we do use items to add labor cost

  • Fredrik Sætre Profile Picture
    12,644 on at
    RE: BOM/Formula calculations

    Do you use items to add labor cost?

  • Community Member Profile Picture
    on at
    RE: BOM/Formula calculations

    Hi Fredrik,

    LBC is labor cost , Yes do not want that item to be added in calculation.

  • Fredrik Sætre Profile Picture
    12,644 on at
    RE: BOM/Formula calculations

    I'm not entirely following you here... I think you're describing to many customer/solution specific terms. I might be missing something.

    What is LBC Qty?

    You also ask for solution for two issues, but only enumerate one...

    But I might get a hint of what is issue. You have an item that you add to you BOM, but do not want to be added as a part of the cost calculation?

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Andrés Arias – Community Spotlight

We are honored to recognize Andrés Arias as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
Syed Haris Shah Profile Picture

Syed Haris Shah 9

#2
Martin Dráb Profile Picture

Martin Dráb 2 Most Valuable Professional

#2
Community Member Profile Picture

Community Member 2

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans