RE: Direct cost is blank on Capacity Ledger Entries
Ok, the times do not automatically copy from the routing to the production journal.
The reason for this is you want people to manually enter the actual times taken to get accurate costs.
However, that is why I asked earlier about the flushing method on the work centre.
If you just want to always record the standard amount of time without the need to manually enter it, set the flushing method to backward. It still won’t show the values, in fact, the line won’t even be seen anymore. But the times will automatically be captured with their routing quantities.
Note that your ledger entries are only created when you finish the production order (Change Status).
For the location issue, select the location code at the bottom of the prod order page and refresh the order.