I love the idea for a new implementation of CRM On-line to do all the work in the Sandbox instance and then switch that instance to a production instance (after all testing, acceptance, etc, is completed).
I'm trying to figure out if this is a better method than creating a solution in the sandbox and importing that solution into a production instance.
My specific question is about the URL.
Say I have a sandbox that I want to switch to prod.
Url for sandbox is companysandbox.crm.dynamics.com/main.aspx
I want prod url to be something like companyprod.crm.dynamics.com/main.aspx
Should I just edit the URL while I'm switching the instance type?
*This post is locked for comments