Including Zero Qty BOM Items When a Production Order is Created in the Production BOM

(0) ShareShare
ReportReport
Posted on by

We have the need to keep a secondary item in our BOM for quality reason, so that we can switch over to the other item if needed.  We do this by including the second item in the BOM as zero qty, then if we need to switch to it, Quality has what they need and we then consume the item used.  Obviously, for MRP this doesn't help us plan for the second item, but that's OK.  

The probably is that if there is a zero qty line in the BOM, it doesn't carry over to the production BOM when a new production order is created.  Is there a way to include zero qty items from the BOM to the Production BOM?  Is there a setting or is there a line of code that allows us to include zero qty items?

*This post is locked for comments

  • guk1964 Profile Picture
    10,877 on at
    RE: Including Zero Qty BOM Items When a Production Order is Created in the Production BOM

    Sounds a neat workaround.

  • EdVW Profile Picture
    on at
    RE: Including Zero Qty BOM Items When a Production Order is Created in the Production BOM

    One option we are going to test is setting the BOM line to a flushing principle of "Manual".  This seems to bring over the line without causing a problem since it's a zero qty item.  Do you see any problems with this method?

  • Suggested answer
    guk1964 Profile Picture
    10,877 on at
    RE: Including Zero Qty BOM Items When a Production Order is Created in the Production BOM

    There are three options:

    Use BOM versions

    Use the substitute item as a phantom made out of the main item - the demand will blow through to the phantom component but you can always issue the phantom parent if need be.

    The third option typically used for tools and changeparts is to add a second BOM line for the substitute part as a negative value i.e. one with a positive quantity with flushing principle set to start and another with negative quantity with flushing principle set to Finish. However for this situation its not a good choice because it will see allocation to issue the item with a future receipt and its more work for mrp also

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Daivat Vartak – Community Spotlight

We are honored to recognize Daivat Vartak as our March 2025 Community…

Announcing Our 2025 Season 1 Super Users!

A new season of Super Users has arrived, and we are so grateful for the daily…

Kudos to the February Top 10 Community Stars!

Thanks for all your good work in the Community!

Leaderboard

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 293,274 Super User 2025 Season 1

#2
Martin Dráb Profile Picture

Martin Dráb 231,933 Most Valuable Professional

#3
nmaenpaa Profile Picture

nmaenpaa 101,156 Moderator

Leaderboard

Featured topics

Product updates

Dynamics 365 release plans