What is the function of capacity journal?

After posting capacity journal what will happen?

*This post is locked for comments

I have the same question (0)
  • Verified answer
    Ishan Profile Picture
    1,285 on at

    Hi Dinesh,

    Capacity journal is for utilizing capacity against non-productive activities like maintenance, break down, non utilization of machine hours due to lack of men power availability(idle time), etc. which you can not post by output journal.

    Also refer below link

    msdn.microsoft.com/.../hh172670(v=nav.70).aspx

    Regards,

    Ishan Patel  

  • Suggested answer
    Ishan Profile Picture
    1,285 on at

    After posting the capacity journal the system will utilize the amount of time entered on the capacity journal line from respective work center/machine center's capacity which is in load of work center/machine center against the stop code selected.

    Regards,

    Ishan Patel

  • Verified answer
    Community Member Profile Picture
    on at

    Check the link:

    msdn.microsoft.com/.../hh172850(v=nav.70).aspx

    In the capacity journal, you post consumed capacities that are not assigned to the production order.

    For example, maintenance work must be assigned to capacity, but not to a production order.

    msdn.microsoft.com/.../hh172962(v=nav.70).aspx

    Check the following pdf for details:

    www.pardaan.com/.../NAV%202009%20-%20Capacities.pdf

  • Verified answer
    Saurabh Shah Profile Picture
    4,560 on at

    Agree with Ishan and Jiju.

    In any manufacturing sector where there is requirement of tracking of work center or machine center, it needs to report the utilisation against the standard availability.

    Now, You can report the standard output with time utilization done against the production order by output or production journal and can book the utilized capacity.

    sometimes, it happens that due to some scheduled maintainance, breakdown or any other reason work was not being done on that work center and if we not book this instance then it will show non utilization. To have this information later on and to generate report it is require to book these instances with time and that is where capacity ledger entry comes into the picture.

    You can create multiple reason codes for this and book the capacity entry. this will not impact on your production order costing.

    Regards,

    Saurabh Shah

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

News and Announcements

Season of Giving Solutions is Here!

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Neeraj Kumar – Community Spotlight

We are honored to recognize Neeraj Kumar as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics NAV (Archived)

#1
HoangNam Profile Picture

HoangNam 7

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans