Hi all
I have a productionorder containing two operations. On the first operation I want to give feedback through Job management. The RouteGroup for this operation are not set to Automatic route consumption. This operation work nice from planning to feedback. For the second operation I want to have automatic route consumption. The route group is set to Automatic route consumption. In production parameters and Start I have set Automatic route consumption to "Route group dependent". When the worker give feedback on the first operation the status on production order is changed to "Started", but no automatic route consumption is happening. My questions is: What is the trigger for the automatic route consumption? Is it possible to have two operations on the same production order with and without automatic route consumption?
Br Erik
*This post is locked for comments
I have the same question (0)