Hello,
It’s been a while since I’ve done a standard cost update and currently need to do so on a couple hundred items. We’re running GP 2013 SP 2 with MFG installed. However, we do not use MFG for anything other than housing a few BOMs. My plan is to use the Standard Cost Changes window for each item and roll/revalue from there.
Using the Standard Cost Changes window, I tested one item to see the results (test company) and was surprised to see that someone had apparently set up some pending costs months ago and never rolled (probably a good thing). I was able to export the item numbers by querying SCV00002 and build a macro to from that last to update the pending cost to 0.00 (not the zero checkbox). This took care of that issue and there were no longer any pending changes. (SCV00002 is now empty.)
My concern now is when I look at the Standard Cost Maintenance window for an item that was pending in the STD Cost Changes window there is still a pending cost. In my test company I did a Roll Up from MFG>Utilities>Roll Up and Revalue and found that there are many, many items with pending cost there. Is there a way to clear out the pending costs from the Maintenance window? I don’t want someone to accidentally run the Roll/Revalue on these values. Obviously I don’t want to do this via SQL as I’m sure there are many linked table.
Hopefully someone has some insight they can share. Thanks in advance!
Jim
*This post is locked for comments
I have the same question (0)