Ben and Black S, let me first say "thanks" for taking time to respond to questions on here. I am new to this forum and have been away from the functional side of BC for over 10 years. Things have changed a little :).
Black S., your steps are a little different, but the result is the same for me. I cannot get the TO to show up in order planning.
I was on the right track according to what Ben has below, but the planning engine still does not recommend a transfer order for the component qty. The only way I can get it to suggest a TO is if I have safety stock on the subcontractor SKU for the component.
Let me run through what I have done and hopefully you can help me figure out what part of your instructions I am missing.
1. My subcontractor location is set as bin mandatory with 1 bin.
2. I have a SKU for the prod order component at the subcontractor work center and set "components at location" to the subcontractor location. There is no "components at location" on the work center card that I know of (you recommended this).
3. On the same SKU, I have also specified the reording policy as lot for lot, set the replenishment system to Transfer, and set the transfer-from code as MAIN.
4. I have a transfer route from MAIN to the SUBCONTRACTOR location.
5. I have a routing link code set up between the routing and BOM.
6. There is no quantity on hand for the component at the subcontractor location.
7. When I run the calc. the regenerative plan, I have no filters outside of a date range wide enough to pick up the demand.
The req worksheet is suggesting a new production order for the produced item, but it does not recommend a transfer order to the subcontractor location for the component needed.