Skip to main content

Notifications

Small and medium business | Business Central, N...
Suggested answer

Limit Posting Periods on Journals

(0) ShareShare
ReportReport
Posted on by 171

Greetings to all of you.

I am trying to limit the posting periods of the users, by filling the Allow Field to and from fields , on the General Ledger setup Page.

Let's say , we have the example below.

pastedimage1651562881416v1.png

I have noticed that, even with this setup, the system allows users to post journal lines with posting date prior to the allow posting from date ( for example 2/2/2022).

Is it how really works ? And if so , how we can actually limit the posting periods on journals? I know that we can use the user setup page and limit the posting period one by one , but i am confident that there must be a faster way to do so.

Thank you in advance for your time.

With respect,

Antonis

  • Suggested answer
    Community Member Profile Picture
    Community Member Microsoft Employee on at
    RE: Limit Posting Periods on Journals

    Antonis,

    I would agree with MahGah on next steps. If they are missing, please add them to the User Setup. Then test.

    Thanks,

    Steve

  • Suggested answer
    MahGah Profile Picture
    MahGah 15,428 on at
    RE: Limit Posting Periods on Journals

    Hi

    Based on all info provided by many what you have described should not happen. Whoever, we had this strange issue one time with one user (we do not know why) and we did the following

    1) Added user to user setup user page then made sure user cannot post based on user setup page.

    2) Then we removed the user from Setup user page and that fixed the issue.

    If this did not help I suggest raise a ticket with Microsoft.

  • AntonisK Profile Picture
    AntonisK 171 on at
    RE: Limit Posting Periods on Journals

    I have a user , with no associated line on the User Setup page. So , basically ,i only have the allow posting from and to from the General Ledger setup page.

    However, the system, still , allows the user , to post from a journal, even if the posting date is less than the allow posting from value which i have filled in the gls page.

  • Suggested answer
    Community Member Profile Picture
    Community Member Microsoft Employee on at
    RE: Limit Posting Periods on Journals

    Antonis,

    Posting is controlled by 3 places:

    1. General Ledger Setup - Allow Posting From and To

    2. User Setup - Allow Posting From and To

    3. Fixed Asset Setup - Allow Posting From and To (related solely to Fixed Asset processing)

    So if you setup the General Ledger Setup fields, this will control all postings. If any User Setup has values in the fields, this overrides the General Ledger Setup.

    Check your User Setup as someone must have a different Posting Date range then that on the General Ledger Setup.

    Hope this helps.

    Thanks,

    Steve

  • Suggested answer
    JAngle Profile Picture
    JAngle 33,159 on at
    RE: Limit Posting Periods on Journals

    Part of this blog shows of a faster way: joshanglesea.wordpress.com/.../

    User setup is the easiest way to control this requirement.

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

News and Announcements

Announcing Category Subscriptions!

Quick Links

December Spotlight Star - Muhammad Affan

Congratulations to a top community star!

Top 10 leaders for November!

Congratulations to our November super stars!

Tips for Writing Effective Verified Answers

Best practices for providing successful forum answers ✍️

Leaderboard

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 291,359 Super User 2024 Season 2

#2
Martin Dráb Profile Picture

Martin Dráb 230,370 Most Valuable Professional

#3
nmaenpaa Profile Picture

nmaenpaa 101,156

Leaderboard

Featured topics

Product updates

Dynamics 365 release plans