Hi!
I work in a manufacturing company, we pack dry beans. Our product has 3 levels:
1 - Single Bags
2 - Case with 24 bags
3 - Pallets with 78 cases
My question - Our customers could buy any of the 3 levels, cause we do sell single bags or just a few cases. How should I set up the BOMs?
This is the list of materials:
1 - beans and film
2 - 1 + Box and tape
3 - 2 + Pallet, slip sheet, shrink wrap.
Do I need to create a different item for each level, considering each as a finished product or there is a way to have 1 item with 3 units of measure and 1 BOM for each unit of measure?
Thanks!
Ana Vieira