I have the following issue regarding Budget control.
I have loaded budget in AX2012 but the balances does not reflect on my Budget funds available report. This is currently preventing any transactions from posting as the control is configuration turned on.
this is the steps that was followed when adding the budget:
I have configured the budget control and activated the control (i did not turn the control on i only activated)
I have loaded budget on all dimensions without using plans. Only created original budget with entries
After posting/updating the balances the i switched on the control so the control setup will take effect.
If some one can please give guidance on why the budget is not available or viable in budget funds available?
*This post is locked for comments
I have the same question (0)