Hi
Hope all is well.
Got a question.
If I run master planning and I want goods to be transferred between say Site A - W/H AA to Site B - W/H BB. A Transfer Order is generated and this is what I want. However if I want goods transferred between Site A – W/H AA to Site A – W/H CC – master planning generates a transfer journal when I firm the planned suggestion. Is there any way this can be a Transfer Order rather than a Transfer journal similar to the first scenario?
That’s it.
Cheers
*This post is locked for comments
I have the same question (0)

Report
All responses (
Answers (