Are there any hidden fields in the planning worksheet that get transferred to the assembly order table?
I'm trying to check how accurate the planning worksheet is by comparing the planned information with the actual posted assembly order. However, I'm facing a challenge because there doesn't seem to be a field that connects the planning worksheet to the assembly order.
Is anyone measuring the same metric? How do you all solve this? Please share some insights.
Thanks in advance.