Field Service PM issue

(0) ShareShare
ReportReport
Posted on by 1,141

Have a scenario that I am looking for the best ( if there is more than one) method to deploy the PM Maintenance process.  There are multiple pieces of equipment that are similar in the required parts and labor but some differ on one or two part replacements.

Do I need to define a PM event for each unique configuration of parts and labor and then attaché that event to a unique schedule or is there a more efficient method.

Example:  Equipment 1, 2, and 3 are on 30 day PM maintenance plan.  1 and 2 require parts A and B with 1 hour labor.  Item 3 requires parts 2 and 3 with 1 hour labor.  Do I need to set up a PM event "A" that includes Parts 1 and 2 and Labor and assign to a PM30 schedule A and then setup PM Event "B" that includes items 2 and 3 with Labor and assign to PM30 schedule B?

Thanks,

Dave 

*This post is locked for comments

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Jainam Kothari – Community Spotlight

We are honored to recognize Jainam Kothari as our June 2025 Community…

Congratulations to the May Top 10 Community Leaders!

These are the community rock stars!

Announcing the Engage with the Community forum!

This forum is your space to connect, share, and grow!

Leaderboard >

Featured topics

Product updates

Dynamics 365 release plans