Project Operations Timesheet Entry provides a poor user interface:
Can't see Time Entry details such as Description
Depending on the default sort multiple Items for the same Project/Task will change order based on lowest to highest time value. This makes identifying specific entries difficult.
If Comment cannot be shown at entry level, the tooltip should be customisable to show additional Time Entry details including Description
The Copy Row action copies the entire row
An Option to copy a single entry should be available
Copy Row should allow entry of target date to enable copying a full week to another week
Import Exchange Appointments doesn't work well
Currently assigns all imported Calendar entries to a blank Project/Task so is of little use
Should allow the option to assign Calendar entries to Projects/Tasks
I understand that there is limited customisation of the Timesheet Entry function possible. Are there alternatives?