Hello there. I am currently attempting to use the configurator to create a high volume, highly configurable product. I have separated the variant parts into user requirements. I am wondering whether there is a way to make sure it picks at least one BOM line from a user requirement? In our old EPR system, we had access to a MIn and Max function.
*This post is locked for comments