Good Day All,
I recently upgraded a client to a test environment going from GP2013 to the latest version of GP2018. I took their current production environment (Server1) and restored it on a new virtual environment (Server2). However, upon the client testing the environment, I have recently found out that all GP Excel reports are pointing to the old server for their connection strings, instead of using the newly upgraded databases on the new server (server2). Is there a way I can mass update all connection strings to use Server2 instead of Server1?
*This post is locked for comments