In AX 2009 I have Report-as-finished an Operation on a Production order. I entered the wrong quantity. I want to "back up" to where I was before I updated the RAF on this Operation and redo it. Nothing I do seems to uncheck the Report-as-finished checkbox on the Route Feedback tab.
*This post is locked for comments
I have the same question (0)