Hi friends,
Is it possible to put raw materials to a different warehouse as it has been picked from?
In my case I have a main warehouse (WHS processing enabled), where the raw materials are stored. After picking them I want to put them to a production sourcing location in a production warehouse (WHS not enabled) on the same site.
My first problem is that I have no Warehouse specified on BOM line because, the raw material input is done by purchase receiving and stored in different warehouses.
So only the reservation can define where the raw materials must be picked.
If i manually specify the warehouse on the BOM line then work is generated, but my put location (which origins of the specified input location of ressource group), is linked to the pick warehouse.
Has anybody an idea how I could solve my problem?
*This post is locked for comments
I have the same question (0)