Hi,
I have a simple Project, time and material.
- Use budget control is active
- budget for transaction type Item and particular Category is defined and approved.
Issue:
When I consume product via Item requirement, the budget is not consumed. The budget should be setup properly, because item consumption (same item as in item requirement) via project item journal affects the budget.
We do not have any modifications in this area.
D365 Installed product version : 10.0.13 (10.0.569.10005)Installed platform version : Update37 (7.0.5746.35600)
Any ideas?
Thanks