Hi @ Ben,
Hit the nail right on the head with that one. Stock is in location and the production order is for another location. Our current procedures requires us to issue the items to the production order location and when the item are installed it is to be journalled off. This way we can track what has been installed and when for traceablity purposes.
In regards to your SKU answer "I also note you don't have SKUs setup for your Item. If you are in a single Location environment, you should use the "Components at Location" field in Manufacturing Setup set to your Location." Below is the screens shot from the Manufacturing set up. We are a one location company and the Components at Location matches our Location. Are you suggesting we should have this set to Yes?
I used the Order tracking on a EL-10604 that has nil stock, nil production orders and no planning set. Yet the planning worksheet is asking me to procure 9.
In the production order for the FP000196 I do not see the EL-10604 item listed in the but I do see the CHN-0074 item listed.
When I go to the item card CHN-0074 item card there are no production orders. So why is the EL-10604 in the production order when the CHN-0074 item is requested?
I appreciate your help. The company we have employed to help us with the BC aren't that flash hence why I am on these forums trying to work out what I am seeing. Also I do not have the access levels I require. I am the procurement manager and can't run the planning worksheet.