Hi
Let say we have the two following planning work sheet batch
Batch 1
Batch 2
Then we run the batch 1 and we make some changes to some suggestions in batch 1. Now if we run batch 2 with the same settings of batch 1 all parts remove from batch 1 and add to batch 2 with the old suggestions. I think this by design in BC to prevent confusion. But sometimes we like to keep some parts in planning worksheet for further evaluation.
Is it anyway in BC that user can lock one line in planning worksheet in order to not be refresh or remove when another batch with same settings prepared?
Thanks