Hi!!
We're using Ax 2012 R3.
In our products BOMs we often have to change a part A with a new/different part B.
- This might be an equivalent part (part B = second source), because we're currently out of stock of the other (part A = original part).
- Most often, this is because we're making a change to the product. In that case we want to use all of part A, and then switch over to part B (phase in/phase out). This is quite complicated because we need to keep track of how much stock we still have of part A, before doing the change in the BOM.
How can Ax do this automatically for us: make the products with part A, until the stock is finished, and then switch to part B ?
Part A and part B have different Item numbers.
Many thanks,
Adriaan
*This post is locked for comments
I have the same question (0)