Hi,
Having an issue with Phantom BOMS and how to keep the assigned operation on the Phantom BOM after the production order is estimated.
Looking for a solution that would keep the BOM lines assigned to the operation assigned in the active BOM.
Phantom items that do not have a route and the phantom components are linked to the route of the parent, the link is not preserved when the production order is estimated. They are assigned to the first operation.