So I am trying to upgrade to SP1 and Keep getting the following error.
Cannot upgrade the database. Unsettled credit card transactions must be settled before the database can be upgraded.
I have all credit card transactions settled within POS2009.
I have all batches settled by adding opening and closing amounts and running Z report on each.
I have run a ZZ Report to close any batches.
After doing all of this I tried one more time and received the same error. I then decided to look within sql and noticed in the Payment batch Table I have 3 CC batches that have a status of either 0 or 3.
The lines with status of zero have no information for request message,response message, and responsebatchapprovalcode.
The lines with status of 3 have a request and response message however they do not have accepted at the end of responsemessage. The also have a responsebatchapprovalcode of QD and a responsebatchnetdeposit of 0.00
Has anyone have a experience with this problem? I appreciate any ideas you can come up with.
This is also the environment it is running on.
Windows 7 64 bit
SQL Server 2008 64 bit
Tim
*This post is locked for comments