Hi,
I have a requirement to represent 3 shifts for manufacturing.
In order to realise the requirement:
- I have registered 3 resources representing operators per allocated shifts.
- Assigned resources to a resource group
- Assigned calendars per operator representing the shifts
However, the result did not come out as I expected
AX did not switch between operators allocated for shift time,
but instead first assigned operator continued to work for the entire production order.
How could I realise switching between operators among shifts?
Sincerely,
ABTS
.