Hi,

I have a requirement to represent 3 shifts for manufacturing.

In order to realise the requirement:

  1. I have registered 3 resources representing operators per allocated shifts. 
  2. Assigned resources to a resource group
  3. Assigned calendars per operator representing the shifts

However, the result did not come out as I expected
AX did not switch between operators allocated for shift time,
but instead first assigned operator continued to work for the entire production order.

How could I realise switching between operators among shifts?

Sincerely,

ABTS

*This post is locked for comments

I have the same question (0)
  • Community Member Profile Picture
    on at

    _D730EC30BC30F330C630FC30B730E730F330_1.gif

  • Community Member Profile Picture
    on at

    Above shows the illustration of desirable result VS Actual Result  

  • Community Member Profile Picture
    on at

    How does shift work represented in AX usually?

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Introducing the 2026 Season 1 community Super Users

Congratulations to our 2026 Super Stars!

Congratulations to our 2025 Community Spotlights

Thanks to all of our 2025 Community Spotlight stars!

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
Joris dG Profile Picture

Joris dG 5

#2
Alexey Lekanov Profile Picture

Alexey Lekanov 2

#2
Henrik Nordlöf Profile Picture

Henrik Nordlöf 2 User Group Leader

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans