Hello All,
I seem to be having an issue with creating a Route in F&SCM, whereby an operation requires the use of a Machine and a H.Resource. I have tried allocating the same operation number, with a secondary operation, however the system will not allow me to do this. Reports an error. I have further tried to assign a different operation number (20 instead of 10) for the secondary, however the system reports an error - / Primary operation not specified/. My ask is, I wish to report on the operation through PFE interface, but not have to register for both the Machine and H.Resource. I am not sure why the system is preventing me from having secondary operations?
TIA