Is that possible to activate multiple BOM versions against a one particular product; so that MRP can do the calculations for all the activated versions. ((same product which having multiple BOMs)
We are getting the order by season wise; and even though the product is same, Bill of materials are getting vary based on the season. And we do the production for both season at once.
As a solution; we tried by activating multiple bom version and activating the date function. But that did not work since there’s an overlap between the dates.
*This post is locked for comments
I have the same question (0)