Running a Master scheduling batch job every night. The system is generating a 'Plan version cleanup' batch job, but I am getting Alerts and records in the Batch job log that I don't really need (recording successful end).
Is there any way to control the Alter and logging behaviour of this batch job?
(and by the way, what is it doing?)
Thanks
Tim
*This post is locked for comments
I have the same question (0)