??? for recurring JE's in SL 7, the original enter (Bat Number) should show the next period to post in the GLTRAN table until it was completed in ttl # of cycles. I am stating that correctly?
Thanks
*This post is locked for comments
??? for recurring JE's in SL 7, the original enter (Bat Number) should show the next period to post in the GLTRAN table until it was completed in ttl # of cycles. I am stating that correctly?
Thanks
*This post is locked for comments
Thanks Rick. It still presents me with quandary, but, I am quite a bit close to my answer now, with your response.
Walt,
I believe that is incorrect. The GLTran items from the recurring batch will always have a period to post equal to the original period to post when the recurring batch was entered. However, the period to post in the batch table for the recurring batch will equal the next period to post for which the recurring batch will be generated.
Stay up to date on forum activity by subscribing. You can also customize your in-app and email Notification settings across all subscriptions.
André Arnaud de Cal... 291,280 Super User 2024 Season 2
Martin Dráb 230,214 Most Valuable Professional
nmaenpaa 101,156