An AP Voucher was created and posted with a project but blank task. We've tried to reverse the voucher, do a project charge entry and j/e to no avail (a task is required). Any recommendations to fixing this? If tables need updating, what tables (aside from aptran/gltran)?
Thanks
Renee
*This post is locked for comments