Hi all,
On the Manufacturing Order Receipt Entry screen when closing a manufacturing order, I think I closed it without checking off "Use all material issued to WIP". I check this off on every order. The reason I think I did not is because, in January, I have a closed MO and it looks like the margin is incredibly high on the item. After drilling into several manufacturing orders for this part around the timeframe in question I see that on the ones that are at appropriate margin the receipt components were consumed. On the incorrect MO it shows no components were consumed. All are zero. Could this be becasue I did not check off the WIP box? If so, can this be fixed?
*This post is locked for comments
Disregard. I figured it out. Thanks again for your help Richard!
Quick question. You said I can set this to default checking that box off. Can you please tell me where I can find the setup window? Thanks in advance!
I will review your website. I appreciate the info and will pay more attention to this in the future. You have been great Richard! Thank you
What Valuation Method are you using for the finished items?
You should have pulled costs from WIP equal to the expected cost of the item (depending on the Valuation Method) with overages or shortages poste to Variances. If you have no costs at all for the items, you can use the adjust cost transaction to value the items in the MO receipt and take the offset from WIP.
I enter the MO's and they go to complete status. I review them and then close them out in a batch on the edit MO status screen. I am thinking we can do a journal entry to offset the error as I can't get back into the order. As I never used all material issued to WIP the leftover costs that were pending went to a variance so it looks like this order cost us nothing to make as far as material goes. Is this accurate?
I believe you can set the defaults for MO Receipts in the MO Setup window.
This option, to take all costs or not, allows shops to issue everything to WIP and then record multiple MO Receipts. If you are using Perpetual or Average costing, you do not want all of the costs included in the first receipt but you will want it in the last receipt. When you do not take all costs in WIP on an MO receipt, it takes the expected costs for the quantity received out of WIP, leaving the rest for later receipts. If additional items were issued due to errors in production or less items were issued due to errors on the BOMs, some firms want these values posted to Variances to expose the issus.
We have a book on Manufacturing Cost Accounting and another on Shop Operations, both of which talk about this flag from different perspectives (cost accounting vs operations). You should check these out on our web site.
Also, are you ultimately closing these MOs, allowing the left over costs to be pulled out of WIP?
Darn! I thought this might be the case. Is there an easy way I can explain what happened to the CFO? If he says he doesn't get what the system did how can I tell him? Also can I fix this on a closed MO?
Yes, it would be. However, when you close the MO, all remaining costs in WIP will be removed and moved to the variance accounts.
Stay up to date on forum activity by subscribing. You can also customize your in-app and email Notification settings across all subscriptions.
André Arnaud de Cal... 291,253 Super User 2024 Season 2
Martin Dráb 230,188 Most Valuable Professional
nmaenpaa 101,156