1) Is there a way inside GP to prevent any cost changes from anywhere outside Item Maintenance screen?
2) I am trying to write a trigger that accepts the cost update only if the change was done form Item Maintenance screen otherwise rollback the changes.
How do I figure out inside the trigger which window the change came form?
Please suggest. Thanks
*This post is locked for comments