Hi,
We are using GP 10.
We are creating a purchase order through eConnect and after that releasing PO through eConnect.
We are cancelling the lines through eConnect. During the process of cancellation, the PO status and line status is changed to “Change Order” as expected.
But during the reconciliation process the PO line status (POLNESTA) is changing to 1 i.e. (NEW). Why the line status is changing to New?
What is the solution for the PO line status should remain intact? (Line status should not change to New)
Thanks in advance.
*This post is locked for comments