Hi,
I have one base solution on source environment named for e.g. "base solution " with version 1.0.0.0,
now created two patches for this solution as follows:
- base solution patch 1 version 1.0.1.0
- base solution patch 2 version 1.0.2.0
Exported this patches from source environment and imported on target environment, on target environment have base solution of version 1.0.0.0 ,now I have above two patches on Target environment.
On source environment , clicked on clone a solution option, so all patches are merged into base solution with version updated to 1.1.0.0. and now exported this package and tried to import it on target environment,but it is failed ,also I'm not getting "stage for upgrade" option while importing this clone solution on Target environment.
on target environment have base solution with version 1.0.0.0,and also two patches
- base solution patch 1 version 1.0.1.0
- base solution patch 2 version 1.0.2.0
*This post is locked for comments
I have the same question (0)