Hello everyone,
I am facing a problem with the new feature „Source products and materials from multiple vendors using Planning Optimization“.
The planning optimization run takes a long time and runs into an error after about 45 minutes. The failure reason is unkown. This happens with the global and also with planning run of a single item.
After removing the product from the multisource policy assignments the planning optimization runs as usual.
Has anyone similar experiences or a solution to the problem?
Thanks in advance!
Kind regards
Sander