I can't seem to get Bulk Delete jobs to run on a regular basis.
In the Bulk Delete Wizard there is the option to run this job after every X days.
The job runs initially when the Wizard is closed but it dows not run again after that. When I look at the bulk delete job after it has run the Recurrence option is set to No and no date/time is in the Next Run fields. All these fields are greyed out so I can't manually update them.
Does anyone know what I am doing wrong or is this a known (or unknown) issue?
I am using on premesis CRM 2013 SP 1 with Rollup 1.
Thanks
*This post is locked for comments
I have the same question (0)