Hi!
I've searched high and low, but I've gotten lost in the information. So I turn to the experts :)
I'm looking to find information on how the travel time/distance is calculated when a workorder is being scheduled. The reason for that, is that I want to be able to exclude and traffic congestion, road works, etc. A prospect requires a theoretical travel distance/time as opposed to the real-time traffic situation.
Moreover, it is possible that FS already does this, but I have no idea what happens behind the scene when travel time/distance is being calculated.
tl;dr:
- can I let FS calculate travel time/distance for a work order, based on the theoretical route, excluding traffic info?
- if that's not possible, what is the actual behavior of the travel time/distance? Does it include traffic or not?
Thank you!
*This post is locked for comments
I have the same question (0)